Aintree Building
Inspections

Waterproofing inspection in Aintree

We inspect the membrane and the screed before any tiles are laid, checking for issues that could cause leaks in the long term.

  • Membrane on and cured, before the tiler starts work
  • About 1 hour on site
  • Report within 24 hours
Get a quoteSend us your details and we will send a price

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookMembrane on and cured, before the tiler starts work
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Aintree waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Aintree builds

Woodlea Estate is a new development with many wet areas being built at once. We often find upturns not turned up correctly, drainage flanges not sealed, and membrane joins that do not have the correct waterproof tape applied.

What we find at this stage in Aintree

  • Drain flanges not sealed or taped
  • Membrane joins taped incorrectly or not at all
  • Upturns cut too short or not turned up to the wall
  • Drain penetrations not waterproofed
  • Screed falls not consistent to the waste
No visible puddle flange, recorded during a waterproofing inspection in Moorabbin
The shower waste does not have a flange to support the waterproofing membrane, Moorabbin
Sample findings

Sample defects found during our waterproofing inspections in Aintree

Annotated findings from Waterproofing inspections.

Waterproofing covered with paint, recorded during a waterproofing inspection in Ocean Grove
The waterproofing is covered with paint and the tile adhesive is not warranted, Ocean Grove
Waterproofing membrane drip marks / application concerns, recorded during a waterproofing inspection in Nar Nar Goon
Visible drip marks on the walls may stop the tile adhesive sticking properly, Nar Nar Goon
Waterproofing bandage inadequate installation, recorded during a waterproofing inspection in Nar Nar Goon
The waterproofing bandage was installed incorrectly, Nar Nar Goon
Non compliant door threshold waterproofing detail, recorded during a waterproofing inspection in Clyde North
The waterproofing detail at the doorway is incomplete and the door jambs are embedded into the tiled floor, Clyde North

The other stages of a Aintree build

  1. Bored piers inspection in Aintree1Bored piersPiers bored and cages placed, before the concrete pour
  2. Slab pre-pour inspection in Aintree2Slab pre-pourSteel exposed and pods fixed, before the concrete
  3. Frame inspection in Aintree3FrameFrame and trusses up, with the roof sheeted, before cladding
  4. Lock-up (pre-plaster) inspection in Aintree4Lock-up (pre-plaster)Roof, windows and doors installed, before plasterboard
  5. Fixing inspection in Aintree5FixingDoors, joinery and mouldings fitted, prior to painting
  6. Pre-handover (PCI) inspection in Aintree7Pre-handover (PCI)Ready for your final check before handover.

All construction stage inspections in Aintree →

Guides

Construction stage guides for Aintree

All guides →

Book a waterproofing inspection in Aintree

Instant online pricing for Aintree, or contact the booking team.

FAQ

Waterproofing inspections in Aintree: common questions

Why does the tape on joins matter?

If the tape fails or is missing, water can run behind the tiles and into the wall cavity.

What is wrong with short upturns?

Water runs down the wall and pools at the floor edge. This eventually causes the tiles to lift.

What does a screed fall issue mean?

It means the floor is not sloped correctly towards the drain. Water will not drain away properly.

Which standard applies here?

AS 3740 covers waterproofing of domestic wet areas, with compliance against the NCC.

Is the plumbing flood tested?

No. A flood test is work that belongs to the waterproofer.

Who fixes these defects?

The waterproofer must make the repairs before the tiler proceeds.

Get a Free Quote