Common building defects in Aintree homes
Across our Aintree jobs the pattern is clear. At slab stage beams often sit narrower than the plans because the concrete formwork was not held in place. The timber frame must have correct tie-downs for openings, strong girder truss support, and connections that meet the engineering plans. The inspector notes missing roof flashing and damaged wall sheeting. Correcting this involves fixing overhanging bricks and making the walls straight. The client needs to fix guttering and loose balustrades before the final inspection.
Fully licensed & accredited
-
Building & Plumbing Commission -
Australian Society of Building Consultants -
Strata Community Association -
Building Dispute Practitioners Society
Slab
Small ceiling joists and ductwork placed inside beams, metal mesh contacting pipes and vapour barriers laid over steel framing.
Frame
Lintel and beam ties are missing. The frame has single studs under the trusses. Roof bracing is not wrapped under the plate.
Lock-up
Roof flashing issues, damaged wall wrap, missing insulation, and structural frame damage found on the original report.
Fixing
Bricks beyond the edge of the slab, walls leaning, or surfaces not flat.
Handover
Drips can run down the wrong way and cladding sits too low. Roof sheets get dented and balustrades loosen.
More about Aintree
- Building a new home in Aintree VIC
- Buying a house in Aintree VIC
- New homes and recent history in Aintree VIC
- Council, permits and defect reports in Aintree
- Site classes, slabs and standards in Aintree VIC
- Building risks in Aintree VIC
- Stage inspections and new builds in Aintree VIC
Written by our local inspection team from work carried out in Aintree. Licensed building practitioners.


